NEW QUESTION 17
Which of the following are properties of ECC Multi-Site Planning? (Choose two.)
- A. The use of scope of planning (cross-plant total planning) is mandatory for Multi-Site Planning.
- B. When using two-step stock transport order with delivery, the receiving plant is defined as a customer.
- C. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
- D. Both withdrawal from alternative plant and withdrawal from another plant are defined via special procurement keys.
Answer: B,D
NEW QUESTION 18
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type.
What does a firming type define? (Choose two)
- A. Handling new procurement proposals that need to be created due to new requirements within the planning time fence.
- B. Handling existing procurement proposals within a planning time fence.
- C. Handling new requirements within the planning time fence.
- D. Handling existing procurement proposals outside the planning time fence.
Answer: A,B
NEW QUESTION 19
Which of the following statements about consumption are correct? (Choose two)
- A. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
- B. Consumption is restructured with the planning run.
- C. Consumption takes place on the material level between the planned independent requirements and the planned orders.
- D. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
Answer: A,D
NEW QUESTION 20
During the processing of production orders planned and actual costs are determined.
On which of the following objects can you collect these costs? (Choose two)
- A. Planned order
- B. Product cost collector
- C. Production order
- D. Work center
Answer: B,C
NEW QUESTION 21
What do you have to consider regarding ATP checks in SAP ECC that are triggered from customer orders?
- A. If the ATP check determines non-availability, it then checks in the next step whether timely procurement or production is possible.
- B. The ATP check does not take stocks and receipts into account. It checks consumption of planned independent requirements.
- C. An ATP check creates fixed links between customer orders and their confirmed receipts.
- D. The ATP quantity is the available quantity that can be used to confirm incoming customer orders.
Answer: D
NEW QUESTION 22
Which of the following scheduling types can only be used in capacity planning?
- A. Only capacity requirements
- B. Midpoint
- C. Forward
- D. Backward
Answer: B
NEW QUESTION 23
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)
- A. Bill of material
- B. Material master
- C. Work center
- D. Production version
- E. Task list
Answer: A,B,E
NEW QUESTION 24
With which functions of the process order can you fulfill the requirements of the Good Manufacturing Practices (GMP) standard? (Choose three.)
- A. Resource selection
- B. Batch record
- C. Availability check
- D. Material identification and reconciliation
- E. Digital signature
Answer: B,D,E
NEW QUESTION 25
What sequence do you follow in master data maintenance to define the production of a material?
- A. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing
- B. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
- C. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
- D. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing
Answer: D
NEW QUESTION 26
Which option for selecting a routing exists when you create a production order?
- A. Automatic selection based on the selection ID in the material master
- B. Automatic selection of a reference operation set
- C. Manual selection based on the list of routings maintained in the material master
- D. Manual selection based on settings in the order type-dependent parameters
Answer: D
NEW QUESTION 27
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.
What do you have to consider in this scenario?
- A. Planned orders are created within the planning time fence and automatically firmed by requirements planning.
- B. The MRP controller cannot create planned orders within the planning time fence.
- C. Planned orders that are created by requirements planning are shifted to the end of the planning time fence.
- D. Requirements planning considers only changes that are relevant for scheduling within the planning time fence.
Answer: C
NEW QUESTION 28
Which functions can be triggered before releasing a production order? (Choose three)
- A. Selection of a BOM
- B. Confirmation
- C. Selection of a routing
- D. Stock determination
- E. Scheduling
Answer: A,C,E
NEW QUESTION 29
The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?
- A. Planning at the assembly level (strategy 70)
- B. Planning with make-to-stock (strategy 10)
- C. Planning with final assembly (strategy 40)
- D. Planning without final assembly (strategy 50)
Answer: D
NEW QUESTION 30
Which of the following statements best defines SAP ERP?
- A. SAP ERP is an application that a company can use to manage its business processes efficiently.
- B. SAP ERP is a system hardware that includes components such as Purchasing, Sales and Distribution, Materials Management, and Production.
- C. SAP ERP is an application that supports all processes involving direct customer contact throughout the entire customer relationship life cycle.
- D. SAP ERP is a system in which advanced planning and optimization processes can be mapped.
Answer: A
NEW QUESTION 31
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB).
The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).
What is the easiest way to fulfill this requirement?
- A. There is no need to take any action. In this scenario, the conversion of units of measurements is done automatically.
- B. Create a new material with a reference to the original material and assign the metric unit of measure to the new material master.
- C. Define a unit of measure group that converts pounds to kilograms in the basic data customizing and assign it to the material master on basic data view 1.
- D. Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master.
Answer: A
NEW QUESTION 32
Which of the following master data can be used with process orders? (Choose three)
- A. Resources
- B. Production/resource tools
- C. Master recipes
- D. Serial numbers
- E. Production versions
Answer: A,C,E
NEW QUESTION 33
From what point can you no longer use the Read PP master data in the production order?
- A. After the first posting of goods movements or confirmation.
- B. After printing the order papers.
- C. After assigning the confirmed quantity of a material component due to carrying out a material availability check.
- D. From the release of the production order.
Answer: A
NEW QUESTION 34
What could be a consequence of the confirmation of an operation?
- A. Rescheduling of the production order
- B. Update of the planned costs
- C. Settlement of the actual costs
- D. Reduction of capacity requirements
Answer: D
NEW QUESTION 35
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three)
- A. Standard values in the operations of routings
- B. General item values of bill of materials
- C. User-defined fields in the operation of routings
- D. General operation values of routings
- E. General values from work scheduling view of the material master
Answer: A,C,D
NEW QUESTION 36
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?
- A. Requirements planning creates an appropriate exception message in basic dates scheduling.
- B. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
- C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
- D. Lead time scheduling cannot take place.
Answer: B
NEW QUESTION 37
In what sequence are the steps of material requirements planning performed in SAP ECC?
- A. 1. Net requirements calculation
2. Lot sizing
3. Determination of the procurement type
4. Scheduling - B. 1. Net requirements calculation
2. Lot sizing
3. Scheduling
4. Determination of the procurement type - C. 1. Calculation of safety stock
2. Lot sizing
3. Scheduling
4. Determination of the procurement type - D. 1. Availability check
2. Lot sizing
3. Determination of the procurement type
4. Scheduling
Answer: A
NEW QUESTION 38
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.)
- A. Material directory
- B. Pull list
- C. Pick list
- D. Logistics Information System (LIS)
- E. Automatic generation of a transport order
Answer: B,C,E
NEW QUESTION 39
Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three)
- A. Batch size optimization
- B. Midpoint scheduling
- C. Finite capacity scheduling
- D. Setup time reduction
- E. Lot size optimization
Answer: B,C,D
NEW QUESTION 40
Which of the following elements do you have to prepare for costing of a production order to function without errors? (Choose three.)
- A. Propose a standard text key in work center.
- B. Enter formulas for costing in the work center.
- C. Assign a production scheduling profile to the material master (product).
- D. Use an operation control key with the indicator costing-relevant.
- E. Assign costing variants to order type.
Answer: B,D,E
NEW QUESTION 41
......
BootcampPDF C-TSCM42-67 Exam Practice Test Questions : https://www.bootcamppdf.com/C-TSCM42-67_exam-dumps.html