API-570 certification exam consists of 150 multiple-choice questions, which cover various topics related to piping inspection, such as corrosion and erosion, welding and fabrication, pressure testing, and inspection techniques. Candidates have four hours to complete the exam, and they must achieve a minimum score of 70% to pass.
Candidates with a background in engineering, quality control, and construction management are suitable for this certification. Those who have experience in the maintenance and inspection of piping systems will find API-570 exam beneficial in enhancing their knowledge and job prospects. The API-570 certification is recognized worldwide, making it an excellent option for those who want to work in the oil and gas industry.
NEW QUESTION # 11
When heat treating welded joints between dissimilar ferritic metals, the temperature range shall be for which metal?
- A. The one with the higher temperature range
- B. The one with the lower temperature range
- C. Either one may be used
- D. The average of both materials
Answer: A
NEW QUESTION # 12
When an injection point circuit for the purpose of inspection is designated, the recommended up stream limit of the injection point circuit shall be the greater of ?
- A. both A and C
- B. minimum 12 inches
- C. maximum 12 inches
- D. three pipe diameters
Answer: A
NEW QUESTION # 13
Actively engaged as an authorized piping inspector shall be defined as a minimum of time spent performing inspection activities.
- A. 50%
- B. 30%
- C. 40%
- D. 20%
Answer: D
NEW QUESTION # 14
What classification does the majority of unit process piping fall in to?
- A. Class 2
- B. Class 3
- C. Class 1
- D. Owner/user designated system
Answer: A
NEW QUESTION # 15
A WPS shall have the referenced
- A. PQR
- B. PDQ
- C. NACE
- D. welder
Answer: A
NEW QUESTION # 16
A pipe has the highest potential of resulting in an immediate emergency if a leak were to occur.
- A. Class 1
- B. Class 2
- C. Class 3
- D. Owner/user designated system
Answer: A
NEW QUESTION # 17
Who has the responsibility for qualifying welding procedures?
- A. Each contractor
- B. Each subcontractor
- C. Each employer
- D. Each welder
Answer: C
NEW QUESTION # 18
What is the maximum measurement for open defects in the weld or heat affect zone for a guided bend specimen?
- A. No open defects are allowed
- B. 3/16"
- C. 1/8"
- D. 1/16"
Answer: C
NEW QUESTION # 19
Which of the following applies to socket welds in piping systems?
- A. Should be avoided
- B. Should be used in all welded piping
- C. Should be avoided where crevice corrosion may occur
- D. Should be welded using SAW only
Answer: C
NEW QUESTION # 20
An area defined by a circle having a diameter not greater than 2 inches for a line diameter not exceeding 10 inches, in which thickness readings may be averaged is
- A. Averaging point
- B. WFMT
- C. Test point
- D. TML
Answer: C
NEW QUESTION # 21
A leak test was performed on a buried piping system. The system was re pressured to 125 psi four hours into the test. Sometime during the final four hours, the gauge fell 5
- A. The piping system failed.
- B. The piping system must be visually inspected
- C. The test must be repeated
- D. The piping system passed
Answer: D
NEW QUESTION # 22
The inspector shall approve all repair and alteration work at designated times, referred to as_______.
- A. inspection delay points
- B. hold points
- C. inspector's discretion
- D. work stop points
Answer: B
NEW QUESTION # 23
Radiographic profile techniques are preferred over ultrasonic thickness measuring instruments for pipe diameters of:
- A. NPS 2 and over
- B. NPS 1 and under
- C. NPS 1 'and over
- D. NPS 2 and under
Answer: B
NEW QUESTION # 24
The repair organization shall maintain records of welding procedures and welder qualifications and make the records available to the inspector_____.
- A. any time during welding
- B. prior to the start of welding
- C. after completion of welding
- D. when the repair organization releases the information
Answer: B
NEW QUESTION # 25
During a MT examination, shall be performed on each area.
- A. a calibration of each piece of magnetizing equipment
- B. at least three separate examinations
- C. 100% coverage at the required sensitivity
- D. prod spacing of at least
Answer: C
NEW QUESTION # 26
API 570 applies to piping systems for process fluids such as:
- A. Raw, intermediate, and finished products.
- B. Firewater
- C. Plumbing, sanitary sewers and storm sewers
- D. Piping systems on trucks, ships and barges
Answer: A
NEW QUESTION # 27
A weld is changed from multi pass per side to single pass per side.
How does this effect the PWHT limitation?
- A. The PWHT is not a consideration
- B. This limitation does not apply when a WPS is qualified with a PWHT above the upper transformation temperature
- C. The PWHT must be performed per ASME IX and time increased byone
- D. This limitation does not apply when a WPS is qualified with a PWHT below the upper transformation temperature
Answer: B
NEW QUESTION # 28
......