NEW QUESTION 39
You are reviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?

  • A. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send.
  • B. Search the work order by customer name to open the work order details page> Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.
  • C. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page> Select required work orders> Click Social icon (OSN) > Select recipient, and click Share.
  • D. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page > Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.

Answer: D

 

NEW QUESTION 40
A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing plant (MP). Sales orders are created and shipped from DW.
Identify the two Sourcing Rules that need to be set for order promising to schedule the order.

  • A. Define Local sourcing rule for organization DW: Source Type Transfer From, Source MP
  • B. Define Local sourcing rule for organization MP: Source Type Make At, Source MP
  • C. Define Local sourcing rule for organization DW: Source Type Make From, Source MP
  • D. Define Local sourcing rule for organization MP: Source Type Transfer To, Source DW

Answer: A,B

 

NEW QUESTION 41
A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged.
Identify the four transactions to correct this situation.

  • A. Reverse from scrap to ready.
  • B. Reverse the product at the last operation.
  • C. Reverse resources charged to a work order.
  • D. Reverse from reject to ready.
  • E. Reverse at an operation.
  • F. Reverse material issued to a work order.

Answer: A,C,D,F

 

NEW QUESTION 42
While creating an item in Product Information Management (PIM), the following two item templates are selected in sequence and applied.
1. Template: Finished Goods (WIP = No, Customer Ordered = Yes)
2. Template: Sub-assembly (WIP = Yes, Customer Ordered = No)
Identify the Item Attribute values in the application.

  • A. WIP = No, Customer Ordered = Yes
  • B. WIP = Yes, Customer Ordered = No
  • C. WIP = Yes, Customer Ordered = Yes
  • D. WIP = No, Customer Ordered = No

Answer: A

 

NEW QUESTION 43
An order entry specialist creates a Back-to-Back order for product item with an intention of fulfilling by in-house manufacturing. The fulfillment line is scheduled and Supply Chain Orchestration (SCO) has initiated creation of a Supply Order rather than Work Order.
Identify two options that can cause this situation.

  • A. Sourcing rules for the product item are defined as Buy as well as Transfer.
  • B. Sourcing rule for the product item is defined as Buy.
  • C. Sourcing rule for the product item is defined as Make, but Work Definition is not defined.
  • D. Sourcing rules for the product item are defined as Make as well as Transfer.

Answer: C,D

 

NEW QUESTION 44
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, has scheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
Which two reasons could cause this?

  • A. The engineer does not have Data access to Item Structures.
  • B. The engineer does not have the Manage Work Definitions function privilege.
  • C. The engineer does not have Data access to Items Attributes.
  • D. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.
  • E. The engineer does not have Data access to Items.

Answer: B,D

 

NEW QUESTION 45
Your customer runs two daily shifts in her plant: Morning Shift and Evening Shift. A resource LATHE is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the Morning Shift and the remaining units are available for the Evening Shits.
Which two actions must you perform to associate LATHE with W1?

  • A. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the resource LATHE in the Morning Shift column.
  • B. Select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the resource LATHE in the Morning Shift column.
  • C. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 40% against the resource LATHE in the Evening Shift column.
  • D. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the resource LATHE in the Evening Shift column.
  • E. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 60% against the resource LATHE in the Morning Shift column.
  • F. Select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the resource LATHE in the Evening Shift column.

Answer: B,E

 

NEW QUESTION 46
Your customer has the following business requirement. There are two work definitions created in the application. One Work Definition for Engine Finished Good and other Work Definition for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Goods as one of its component.
Identify the way to establish the relationship between Pallet and Engine Work Definitions.

  • A. Create a Subinventory that could be the completion Subinventory for yielding the pallet and then the same Subinventory can serve as the supply Subinventory of the pallet in the Work Definition created for Engine.
  • B. The two Work Definitions can be tied through Project or Seiban numbers.
  • C. The Work Definition versions can be used to tie the Work Orders.
  • D. Assign a higher priority to the Work Definition created for Engine and a lower one for the Work Definition for Pallet.

Answer: C

 

NEW QUESTION 47
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.

  • A. Create accounting
  • B. Transfer Transactions from Production to Costing
  • C. Transfer Transactions from Inventory to Costing
  • D. Transfer Costs to Cost Management

Answer: B

 

NEW QUESTION 48
Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.

  • A. Rescheduled Work Order WO-2045 duration = 1.25 days
  • B. Rescheduled Work Order WO-2045 duration = 3.25days
  • C. Rescheduled Work Order WO-2045 duration = 0.75 days
  • D. Rescheduled Work Order WO-2045 duration = 2 days

Answer: C

 

NEW QUESTION 49
Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items with some overlap between them in terms of products manufactured. The distribution centers stock parts from all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants are allowed to change some attributes locally.
Identify two different ways of achieving this requirement.

  • A. Set up Plants as Inventory Organizations, Distribution Centers as Inventory Organizations, and Corporate Engineering organizations as Item Organization.
  • B. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Item Organization.
  • C. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Inventory Organization.
  • D. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Inventory Organization.
  • E. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Item Organization

Answer: A,E

 

NEW QUESTION 50
A Production operator in your company is required to report production activities, such as completing or scrapping production units, by referencing a work definition without creating work orders.
Identify the manufacturing transaction that a production operator can perform for reporting such activities.

  • A. Material Transactions
  • B. Resource Transactions
  • C. Orderless Transactions
  • D. Operation Transactions
  • E. Movement request

Answer: C

 

NEW QUESTION 51
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product.
Which seeded job role must this employee be provided with?

  • A. Manufacturing Supervisor
  • B. Production Supervisor
  • C. Production Operator
  • D. Production Engineer
  • E. Manufacturing Engineer

Answer: E

 

NEW QUESTION 52
As a production supervisor, you require immediate access to critical shop floor execution systems to take action while on the go.
Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?

  • A. Releasing work orders using quick swipe details
  • B. Reviewing customer information of work orders
  • C. Executing standard work order and updating item and resource usage
  • D. Reviewing operation, component, and resource detail
  • E. Searching for work orders and sending them through e-mail
  • F. Creating a new standard or non standard work order

Answer: A,B,D,E

 

NEW QUESTION 53
A plant runs 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours. The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?

  • A. 8:00 PM
  • B. 4:00 PM
  • C. 12:30 PM
  • D. 2:00 PM
  • E. 1:00 PM

Answer: B

 

NEW QUESTION 54
Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an operation.
Identify the reason.

  • A. The user doesn't have Data access to create item structure.
  • B. The user doesn't have Override Item Structure Components in the Work Definition privileges.
  • C. An item cannot be assigned on an ad hoc basis.
  • D. The user doesn't have access to the PIM module.

Answer: C

 

NEW QUESTION 55
Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

  • A. State Date
  • B. Costing Priority
  • C. Version
  • D. Production Priority

Answer: A,C

 

NEW QUESTION 56
Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements.
Identify four REST resources and the corresponding HTTP action available with Manufacturing Cloud.

  • A. Work Order Status GET method
  • B. Work Order Status POST method
  • C. Resource transaction POST method
  • D. Resource transaction GET method
  • E. Work Orders PATCH method
  • F. Work Orders GET method

Answer: A,C,E,F

 

NEW QUESTION 57
You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?

  • A. Select the infotile On Hold> Select a work order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK
  • B. Select the infertile Dispatch List> Select a work order operation you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
  • C. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK
  • D. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK

Answer: B

 

NEW QUESTION 58
Which entity should you use to configure the manufacturing plant in Functional Manager?

  • A. Organization
  • B. Plant
  • C. Legal Entity
  • D. Business Unit

Answer: B

 

NEW QUESTION 59
The Manufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day and Night Shift.
Identify the correct sequence of steps to achieve this requirement.

  • A. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
  • B. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column
  • C. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.
  • D. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.

Answer: C

 

NEW QUESTION 60
......